Countries · Countries · about 5 min read

Roulette Casinos in Japan (Integrated Resorts)

MGM Osaka is under construction, with an opening targeted for autumn 2030. Its future game rules should not be guessed from the operator’s other casinos.

Short answer

As of 15 November 2026, Japan’s approved Osaka integrated-resort project is still being built. Plans target autumn 2030, while a new application window for other projects is scheduled for 2027. Casino entry fees and visit limits have specific nationality and residence rules. Betting at an offshore online casino from Japan remains a criminal offence.

Osaka opening target
around autumn 2030; subject to change
planned table games
470 in MGM’s Q3 2026 presentation
casino entry fee
¥6,000 where applicable; 24-hour validity
entry-count limits
3 in 7 consecutive days; 10 in 28

Where things stand

MGM Osaka on Yumeshima is a construction project, not an open casino. Osaka Prefecture’s October 2026 update records main construction starting in April 2025 and an opening target around autumn 2030. A target date is not a guarantee.

Japan’s framework allows approval of up to three integrated-resort districts. The Japan Tourism Agency’s March 2026 announcement identified Osaka as the only approved district and set the next application period for 6 May–5 November 2027. Applications and district approval are distinct from the casino operating licence required before gambling can begin.

subjectframework to check
IR districtsup to three approved districts; one casino facility per district
gaming areaarea used exclusively for casino gaming cannot exceed 3% of total IR floor area
minimum age20; exclusions and other restrictions also apply
entry fee¥6,000 total where applicable, valid for 24 hours
entry-count limitsthree in seven consecutive days and ten in 28 consecutive days, for those covered
regulatorJapan Casino Regulatory Commission (JCRC)

What the floor will look like

MGM’s third-quarter 2026 investor presentation describes a planned 470 table games and 6,400 gaming machines. These are project figures, not a count of operating equipment or a list of approved roulette variants.

A brand’s games in another country do not establish Osaka’s future wheel types, payoutsmoneyPayoutThe amount paid on a winning wager. Check whether the quoted figure is net profit or total return including the stake.Read full definition →, minimums or terminal rules. Check the final approved game rules and operating information when available. Describing the future roulette as certainly single zerowheelZeroThe 0 outcome, conventionally shown in green. Ordinary color, parity, high/low, dozen and column bets do not include it.Read full definition →, or promising low-stakes electronic stadiums, would go beyond the evidence here.

Electronic Roulette Terminals

Online and the gray market

Japan’s National Police Agency states that connecting from Japan to an overseas online casino and gambling is a crime, even if the operator is legal in its own country. Its examples include action against customers as well as operators and affiliates. An overseas licence does not remove the Japanese restriction.

A 2025 amendment also prohibits specified activities that present or direct people in Japan to illegal online gambling services. The police identify 25 September 2025 as the commencement date and give examples such as promotional links and recommendation sites. These rules are separate from the licensing framework for future land-based integrated resorts.

Who pays and who is subject to entry limits

The exemption is for foreign nationals without a residence in Japan. It is not a blanket exemption for anyone carrying a passport. Japanese nationals living abroad remain within the entry-limit framework, and foreign residents of Japan are not exempt merely because they have foreign nationality. JCRC’s published responses to consultation questions make these distinctions explicit.

For those covered, the national and local fees total ¥6,000 with 24-hour validity. Entry counts are measured over consecutive seven-day and 28-day periods, not calendar weeks and months. Identification procedures also depend on the person’s status.

These are restrictions on casino entry, not a fee for walking into the entire resort and not a recommended amount of gambling. Paying the fee does not guarantee admission if another restriction applies.

Osaka IR: approvals, construction and plans
2023

The Osaka area development plan is approved.

2025

Main construction begins in April.

2026

Official updates continue to target an autumn 2030 opening.

2027

New district applications are scheduled for 6 May–5 November.

2030

Target opening year for MGM Osaka, not a guaranteed date.

Advice for a future visitor

Use the latest official opening announcement and entry guidance when planning a visit. The fee exemption depends on nationality and residence together, and the identity documents accepted for one category may differ from another.

Do not book on the assumption that construction plans guarantee a particular roulette game, minimum stake or opening date. The casino’s future rules will determine the bets available. None of the land-based project’s progress changes the current prohibition on gambling at offshore online casinos from Japan.

An imagined casino entrance with identity checks; this illustration does not show an operating Japanese casino or its admission procedures.

Questions

Can I visit MGM Osaka’s casino now?

No. As of 15 November 2026 it remains under construction, with an opening target around autumn 2030. Check for later official updates rather than treating the target as a fixed promise.

Will there be more than one integrated resort?

The framework allows up to three approved districts. A new application window is scheduled for 6 May–5 November 2027. That does not guarantee that another proposal will be approved or when it might open.

Do all foreign passport holders avoid the casino fee?

No. The exemption is for foreign nationals without a residence in Japan. Nationality, residence and the required identification all matter; a passport alone is not the rule.

Do the visit limits mean three visits per calendar week?

No. They use consecutive seven-day and 28-day periods, with the statutory counting rules. Do not treat a new calendar week or month as an automatic reset.

Comic relief

A construction plan is not a roulette paytable.

A construction plan is not a roulette paytable.

Sources

  1. Osaka Prefecture, construction update, October 2026 https://www.pref.osaka.lg.jp/documents/34651/irkensetsukouji_202610.pdf
  2. MGM Resorts, Q3 2026 investor presentation, planned equipment https://investors.mgmresorts.com/image/3Q-2026-Presentation-vFinal.post.pdf
  3. Japan Tourism Agency, IR framework and application periods https://www.mlit.go.jp/kankocho/seisaku_seido/kihonkeikaku/inbound_kaifuku/ir/tokuteifukugokanko.html
  4. Japan Tourism Agency, new application window, 10 March 2026 https://www.mlit.go.jp/kankocho/news11_00014.html
  5. JCRC, overview of casino regulation https://www.jcrc.go.jp/en/policy/regulatory/casino.html
  6. JCRC, consultation responses 293 and 298 on fee and entry-limit scope https://www.jcrc.go.jp/content/000000903.pdf
  7. Osaka Prefecture, IR questions and casino entry fee https://www.pref.osaka.lg.jp/o080010/irs-kikaku/irfaq/index.html
  8. National Police Agency, online casino offences and 2025 advertising restrictions https://www.npa.go.jp/bureau/safetylife/hoan/onlinecasino/onlinecasino.html
Default model: European, single zero; exceptions are stated in the articlemethodology ↗sources ↗